AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

AU-0067

Adelaide River Helicopter Landing Site · Adelaide River

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
185 ft / 56 m
Transition Altitude
10,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Adelaide River Helicopter Landing Site (AU-0067), located in Adelaide River, Australia. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 185 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 10,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Adelaide River Helicopter Landing Site
ICAO / IATA
AU-0067 / —
Municipality
Adelaide River
Country
Region
AU-NT — Northern Territory
GPS Coordinates
Transition Altitude
10,000 ft
Elevation
185 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

YPDNILS
Darwin International Airport / RAAF Darwin
95 km / 51 nm
YBTI
Bathurst Island Airport
172 km / 93 nm
YPTN
Tindal Airport
198 km / 107 nm
YPKT
Port Keats Airport
204 km / 110 nm
YSNB
Snake Bay Airport
208 km / 112 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026