AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

BR-0691

Fazenda Nova Esperança Airport. · Recursolândia

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
1,014 ft / 309 m
Transition Altitude
7,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Fazenda Nova Esperança Airport. (BR-0691), located in Recursolândia, Brazil. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 1,014 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 7,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Fazenda Nova Esperança Airport.
ICAO / IATA
BR-0691 / —
Municipality
Recursolândia
Country
Region
BR-TO — Tocantins
GPS Coordinates
Transition Altitude
7,000 ft
Elevation
1,014 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

SBCI
Brig. Lysias Augusto Rodrigues Airport
143 km / 77 nm
SWGN
Araguaína Airport
195 km / 105 nm
SBPJ
Brigadeiro Lysias Rodrigues Airport
238 km / 129 nm
SBAA
Conceição do Araguaia Airport
245 km / 132 nm
SBPN
Porto Nacional Airport
281 km / 152 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026