AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

BR-0726

Fazenda Tapyratynga Airport · Pimenteiras do Oeste

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
745 ft / 227 m
Transition Altitude
7,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Fazenda Tapyratynga Airport (BR-0726), located in Pimenteiras do Oeste, Brazil. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 745 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 7,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Fazenda Tapyratynga Airport
ICAO / IATA
BR-0726 / —
Municipality
Pimenteiras do Oeste
Country
Region
BR-RO — Rondônia
GPS Coordinates
Transition Altitude
7,000 ft
Elevation
745 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

SBVH
Brigadeiro Camarão Airport
149 km / 81 nm
SLSV
San Ignacio de Velasco Airport
412 km / 223 nm
SLTRILS
Teniente Av. Jorge Henrich Arauz Airport
439 km / 237 nm
SLSA
Santa Ana Del Yacuma Airport
444 km / 240 nm
SBGM
Guajará-Mirim Airport
467 km / 252 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026