AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

BR-0821

Fazenda Santo Angelo Airport · Barra do Choça

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
2,936 ft / 895 m
Transition Altitude
7,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Fazenda Santo Angelo Airport (BR-0821), located in Barra do Choça, Brazil. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 2,936 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 7,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Fazenda Santo Angelo Airport
ICAO / IATA
BR-0821 / —
Municipality
Barra do Choça
Country
Region
BR-BA — Bahia
GPS Coordinates
Transition Altitude
7,000 ft
Elevation
2,936 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

BR-0569
Glauber de Andrade Rocha Airport
30 km / 16 nm
SBIL
Bahia - Jorge Amado Airport
174 km / 94 nm
SBPS
Porto Seguro Airport
246 km / 133 nm
SBSVILS
Deputado Luiz Eduardo Magalhães International Airport
330 km / 178 nm
SBLP
Bom Jesus da Lapa Airport
345 km / 186 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026