AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

BR-0864

Heliponto Conduspar · São José dos Pinhais

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
3,064 ft / 934 m
Transition Altitude
7,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Heliponto Conduspar (BR-0864), located in São José dos Pinhais, Brazil. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 3,064 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 7,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Heliponto Conduspar
ICAO / IATA
BR-0864 / —
Municipality
São José dos Pinhais
Country
Region
BR-PR — Paraná
GPS Coordinates
Transition Altitude
7,000 ft
Elevation
3,064 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

SBCTILS
Afonso Pena Airport
5 km / 3 nm
SBBI
Bacacheri Airport
20 km / 11 nm
SBJVILS
Lauro Carneiro de Loyola Airport
81 km / 44 nm
SBPG
Ponta Grossa Airport - Comandante Antonio Amilton Beraldo
109 km / 59 nm
SBNFILS
Ministro Victor Konder International Airport
154 km / 83 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026