AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

BR-0925

Fazenda Rosa do Deserto Airstrip · Ubaíra

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
1,411 ft / 430 m
Transition Altitude
7,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Fazenda Rosa do Deserto Airstrip (BR-0925), located in Ubaíra, Brazil. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 1,411 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 7,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Fazenda Rosa do Deserto Airstrip
ICAO / IATA
BR-0925 / —
Municipality
Ubaíra
Country
Region
BR-BA — Bahia
GPS Coordinates
Transition Altitude
7,000 ft
Elevation
1,411 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

SBSVILS
Deputado Luiz Eduardo Magalhães International Airport
160 km / 86 nm
SBIL
Bahia - Jorge Amado Airport
192 km / 104 nm
BR-0569
Glauber de Andrade Rocha Airport
223 km / 121 nm
SBPS
Porto Seguro Airport
363 km / 196 nm
SBARILS
Aracaju - Santa Maria International Airport
385 km / 208 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026