AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

BR-1916

Aldeia Rio Vermelho (Krénhêdjã) Airstrip · Ourilândia do Norte

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
791 ft / 241 m
Transition Altitude
7,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Aldeia Rio Vermelho (Krénhêdjã) Airstrip (BR-1916), located in Ourilândia do Norte, Brazil. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 791 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 7,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Aldeia Rio Vermelho (Krénhêdjã) Airstrip
ICAO / IATA
BR-1916 / —
Municipality
Ourilândia do Norte
Country
Region
BR-PA — Pará
GPS Coordinates
Transition Altitude
7,000 ft
Elevation
791 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

SBCJ
Carajás Airport
248 km / 134 nm
SBAA
Conceição do Araguaia Airport
266 km / 144 nm
SBMA
João Correa da Rocha Airport
374 km / 202 nm
SWGN
Araguaína Airport
376 km / 203 nm
SBCC
Campo de Provas Brigadeiro Veloso
412 km / 223 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026