Reference only — not for real-world navigation.
CYXJ
Fort St John / North Peace Regional Airport · Fort Saint John
Key Facts
Essential technical summary for MSFS 2020/2024 and X-Plane.
ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
2,280 ft / 695 m
Transition Altitude
18,000 ft
Primary Channel
ATIS 128.50 MHz (ATIS)
Live Conversion
inHg
hPa
Flight Planning
Quick Jump to Next Destination
Tip: Search your next airport to quickly compare ILS data.
Welcome to the technical flight briefing for Fort St John / North Peace Regional Airport (CYXJ), located in Fort Saint John, Canada. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 2 active runways with a maximum elevation of 2,280 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 18,000 ft verified for this field for altimeter reset procedures.
Full Name
Fort St John / North Peace Regional Airport
ICAO / IATA
CYXJ / YXJ
Municipality
Fort Saint John
Country
Region
CA-BC — British Columbia
GPS Coordinates
Transition Altitude
18,000 ft
Elevation
2,280 ft
Wikipedia
Pilot Toolbox
External charts, live tracking and weather reports.
Runway 12 / 30
LIGHTED
Runway Length: 6,909 ft / 2,106 m
Runway Width: 150 ft / 46 m
Surface Type: Asphalt
Heading: 135° / 315°
Runway Width: 150 ft / 46 m
Surface Type: Asphalt
Heading: 135° / 315°
RWY 12 (135°)
No ILS / Visual Only
RWY 30 (315°)
No ILS / Visual Only
Runway 03 / 21
LIGHTED
Runway Length: 6,698 ft / 2,042 m
Runway Width: 198 ft / 60 m
Surface Type: Asphalt
Heading: 45° / 225°
Runway Width: 198 ft / 60 m
Surface Type: Asphalt
Heading: 45° / 225°
RWY 03 (45°)
No ILS / Visual Only
RWY 21 (225°)
No ILS / Visual Only
A/G MF ST JOHN RDO
118.50 MHz
ATIS ATIS
128.50 MHz
CNTR EDMONTON CNTR
132.60 MHz
FSS RDO
118.50 MHz
RCO EDMONTON RDO
122.50 MHz
Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026