AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

EDRN

Nannhausen Airfield · Nannhausen

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
1,224 ft / 373 m
Transition Altitude
5,000 ft
Primary Channel
AFIS 123.53 MHz (Langen Information)
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Nannhausen Airfield (EDRN), located in Nannhausen, Germany. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 1,224 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 5,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Nannhausen Airfield
ICAO / IATA
EDRN / —
Municipality
Nannhausen
Country
Region
DE-RP — Rhineland-Palatinate
GPS Coordinates
Transition Altitude
5,000 ft
Elevation
1,224 ft
Official Website
Wikipedia

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

AFIS Langen Information
123.53 MHz
INFO Nannhausen Radio
131.28 MHz

Nearby Airports

Alternative airports in the vicinity (km & nm).

EDFHILS
Frankfurt-Hahn Airport
16 km / 8 nm
ETSB
Büchel Air Base
37 km / 20 nm
EDFZ
Mainz-Finthen Airfield
48 km / 26 nm
ETAD
Spangdahlem Air Base
56 km / 30 nm
ETAR
Ramstein Air Base
60 km / 32 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026