AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

ES-0025

Aerodromo de Figueira dos Cavaleiros · Ferreira do Alentejo

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
262 ft / 80 m
Transition Altitude
4,000 ft
Primary Channel
Info 123.75 MHz ()
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Aerodromo de Figueira dos Cavaleiros (ES-0025), located in Ferreira do Alentejo, Portugal. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 262 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 4,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Aerodromo de Figueira dos Cavaleiros
ICAO / IATA
ES-0025 / —
Municipality
Ferreira do Alentejo
Country
Region
PT-02 — Beja District
GPS Coordinates
Transition Altitude
4,000 ft
Elevation
262 ft
Official Website

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

Info
123.75 MHz

Nearby Airports

Alternative airports in the vicinity (km & nm).

LPBJ
Beja Airport / Airbase
27 km / 14 nm
LPEV
Évora Airfield
59 km / 32 nm
LPMT
Montijo Air Base
99 km / 53 nm
LPPM
Portimão Airport
108 km / 58 nm
LPPTILS
Lisbon Humberto Delgado Airport
111 km / 60 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026