AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

GCMP

Maspalomas Station Heliport · ESA Special Station

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
471 ft / 144 m
Transition Altitude
6,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Maspalomas Station Heliport (GCMP), located in ESA Special Station, Spain. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 471 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 6,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Maspalomas Station Heliport
ICAO / IATA
GCMP / —
Municipality
ESA Special Station
Country
Region
ES-CN — Canary Islands
GPS Coordinates
Transition Altitude
6,000 ft
Elevation
471 ft
Official Website
Wikipedia

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

GCLPILS
Gran Canaria Airport
31 km / 17 nm
GCTSILS
Tenerife Sur Airport
97 km / 52 nm
GCXOILS
Tenerife Norte-Ciudad de La Laguna Airport
106 km / 57 nm
GCFVILS
Fuerteventura Airport
190 km / 102 nm
GCHI
El Hierro Airport
222 km / 120 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026