Reference only — not for real-world navigation.
GOOY
Léopold Sédar Senghor International Airport · Dakar
Key Facts
Essential technical summary for MSFS 2020/2024 and X-Plane.
ILS Approach StatusILS FREQUENCIES VERIFIED ✅
Field Elevation
85 ft / 26 m
Transition Altitude
5,000 ft
Primary Channel
TWR 118.10 MHz (DAKAR TWR)
Live Conversion
inHg
hPa
Flight Planning
Quick Jump to Next Destination
Tip: Search your next airport to quickly compare ILS data.
Welcome to the technical flight briefing for Léopold Sédar Senghor International Airport (GOOY), located in Dakar, Senegal. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 2 active runways with a maximum elevation of 85 ft. Instrument approaches (IFR) are supported with verified ILS frequencies and identifiers for precision landings.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 5,000 ft verified for this field for altimeter reset procedures.
Full Name
Léopold Sédar Senghor International Airport
ICAO / IATA
GOOY / DKR
Municipality
Dakar
Country
Region
SN-DK — Dakar Region
GPS Coordinates
Transition Altitude
5,000 ft
Elevation
85 ft
Official Website
Wikipedia
Pilot Toolbox
External charts, live tracking and weather reports.
Runway 18 / 36
ILS EQUIPPEDLIGHTED
Runway Length: 11,450 ft / 3,490 m
Runway Width: 148 ft / 45 m
Surface Type: Asphalt
Heading: 172.6° / 352.6°
Runway Width: 148 ft / 45 m
Surface Type: Asphalt
Heading: 172.6° / 352.6°
RWY 18 (172.6°)
No ILS / Visual Only
RWY 36 (352.6°)
109.90 MHz
IDENT: I-DK | CRS: 2°
Runway 03 / 21
UNLIT
Runway Length: 4,866 ft / 1,483 m
Runway Width: 98 ft / 30 m
Surface Type: Asphalt
Heading: 23° / 203°
Runway Width: 98 ft / 30 m
Surface Type: Asphalt
Heading: 23° / 203°
RWY 03 (23°)
No ILS / Visual Only
RWY 21 (203°)
No ILS / Visual Only
APP DAKAR CON
120.50 MHz
INFO DAKAR INFO
129.50 MHz
INFO DAKAR INFO
345.20 MHz
TWR DAKAR TWR
118.10 MHz
Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026