AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

ID-0187

Amandaratu Heliport · Sukabumi

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
112 ft / 34 m
Transition Altitude
11,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Amandaratu Heliport (ID-0187), located in Sukabumi, Indonesia. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 112 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 11,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Amandaratu Heliport
ICAO / IATA
ID-0187 / —
Municipality
Sukabumi
Country
Region
ID-JB — Jawa Barat (West Java)
GPS Coordinates
Transition Altitude
11,000 ft
Elevation
112 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

WIHH
Halim Perdanakusuma International Airport
131 km / 71 nm
WICC
Husein Sastranegara International Airport
131 km / 71 nm
WIIIILS
Soekarno-Hatta International Airport
140 km / 75 nm
WICA
Kertajati International Airport
202 km / 109 nm
WILL
Radin Inten II International Airport
277 km / 149 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026