AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

IR-0067

Iranshahr Thermal Power Plant Heliport · Rig-e Kaput

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
1,768 ft / 539 m
Transition Altitude
10,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Iranshahr Thermal Power Plant Heliport (IR-0067), located in Rig-e Kaput, Iran. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 1,768 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 10,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Iranshahr Thermal Power Plant Heliport
ICAO / IATA
IR-0067 / —
Municipality
Rig-e Kaput
Country
Region
IR-11 — Sistan and Baluchestan Province
GPS Coordinates
Transition Altitude
10,000 ft
Elevation
1,768 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

OIZI
Iranshahr Airport
23 km / 12 nm
OIZC
Chabahar Konarak International Airport
199 km / 107 nm
OIZH
Zahedan International Airport
253 km / 137 nm
OIKM
Bam Airport
287 km / 155 nm
OPGW
Gwadar International Airport
288 km / 155 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026