AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

IT-0100

Aviosuperficie Alisoriano · Soriano nel Cimino (VT)

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
985 ft / 300 m
Transition Altitude
6,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Aviosuperficie Alisoriano (IT-0100), located in Soriano nel Cimino (VT), Italy. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 985 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 6,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Aviosuperficie Alisoriano
ICAO / IATA
IT-0100 / —
Municipality
Soriano nel Cimino (VT)
Country
Region
IT-62 — Lazio
GPS Coordinates
Transition Altitude
6,000 ft
Elevation
985 ft
Official Website

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

LIRV
Viterbo Airport
19 km / 10 nm
LIRU
Rome Urbe Airport
56 km / 30 nm
LIRG
Guidonia Air Base
62 km / 33 nm
LIRFILS
Rome–Fiumicino Leonardo da Vinci International Airport
70 km / 38 nm
LIRAILS
Ciampino–G. B. Pastine International Airport
75 km / 40 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026