AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

JP-1068

Iwate Prefectural Miyako Hospital Heliport · Miyako

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
377 ft / 115 m
Transition Altitude
14,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Iwate Prefectural Miyako Hospital Heliport (JP-1068), located in Miyako, Japan. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 377 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 14,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Iwate Prefectural Miyako Hospital Heliport
ICAO / IATA
JP-1068 / —
Municipality
Miyako
Country
Region
JP-03 — Iwate Prefecture
GPS Coordinates
Transition Altitude
14,000 ft
Elevation
377 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

RJSI
Iwate Hanamaki Airport
75 km / 40 nm
RJSH
JMSDF Hachinohe Air Base / Hachinohe Airport
107 km / 58 nm
RJSMILS
Misawa Airport / Misawa Air Base
126 km / 68 nm
RJSR
Odate Noshiro Airport
147 km / 79 nm
RJSKILS
Akita Airport
148 km / 80 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026