AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

JP-2907

Osaka Shoko Shinkin Bank New Head Office Helipad · Osaka

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
0 ft / —
Transition Altitude
14,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Osaka Shoko Shinkin Bank New Head Office Helipad (JP-2907), located in Osaka, Japan. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 0 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 14,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Osaka Shoko Shinkin Bank New Head Office Helipad
ICAO / IATA
JP-2907 / —
Municipality
Osaka
Country
Region
JP-27 — Ōsaka Prefecture
GPS Coordinates
Transition Altitude
14,000 ft
Elevation
0 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

RJOOILS
Osaka International Airport
13 km / 7 nm
RJOY
Yao Airport
13 km / 7 nm
RJBE
Kobe Airport
26 km / 14 nm
RJBBILS
Kansai International Airport
37 km / 20 nm
RJOS
Tokushima Awaodori Airport / JMSDF Tokushima Air Base
103 km / 55 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026