AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

JP-3508

Yoshida Town Flood Control Center Heliport · Yoshida

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
16 ft / 5 m
Transition Altitude
14,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Yoshida Town Flood Control Center Heliport (JP-3508), located in Yoshida, Japan. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 16 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 14,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Yoshida Town Flood Control Center Heliport
ICAO / IATA
JP-3508 / —
Municipality
Yoshida
Country
Region
JP-22 — Shizuoka Prefecture
GPS Coordinates
Transition Altitude
14,000 ft
Elevation
16 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

RJNYILS
JASDF Shizuhama Air Base
5 km / 3 nm
RJNS
Mount Fuji Shizuoka Airport
10 km / 5 nm
RJNH
JASDF Hamamatsu Air Base
53 km / 29 nm
RJTO
Oshima Airport
98 km / 53 nm
RJTA
JMSDF Atsugi Air Base / Naval Air Facility Atsugi
131 km / 71 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026