Reference only — not for real-world navigation.
KOTG
Worthington Municipal Airport · Worthington
Key Facts
Essential technical summary for MSFS 2020/2024 and X-Plane.
ILS Approach StatusILS FREQUENCIES VERIFIED ✅
Field Elevation
1,574 ft / 480 m
Transition Altitude
18,000 ft
Primary Channel
AWOS 110.60 MHz (AWOS 3)
Live Conversion
inHg
hPa
Flight Planning
Quick Jump to Next Destination
Tip: Search your next airport to quickly compare ILS data.
Welcome to the technical flight briefing for Worthington Municipal Airport (KOTG), located in Worthington, United States. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 2 active runways with a maximum elevation of 1,574 ft. Instrument approaches (IFR) are supported with verified ILS frequencies and identifiers for precision landings.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 18,000 ft verified for this field for altimeter reset procedures.
Full Name
Worthington Municipal Airport
ICAO / IATA
KOTG / OTG
Municipality
Worthington
Country
Region
US-MN — Minnesota
GPS Coordinates
Transition Altitude
18,000 ft
Elevation
1,574 ft
Wikipedia
Pilot Toolbox
External charts, live tracking and weather reports.
Runway 11 / 29
ILS EQUIPPEDLIGHTED
Runway Length: 5,506 ft / 1,678 m
Runway Width: 100 ft / 30 m
Surface Type: Asphalt
Heading: 115° / 295°
Runway Width: 100 ft / 30 m
Surface Type: Asphalt
Heading: 115° / 295°
RWY 11 (115°)
No ILS / Visual Only
RWY 29 (295°)
111.70 MHz
IDENT: OTG | CRS: 293°
Runway 17 / 35
LIGHTED
Runway Length: 4,201 ft / 1,280 m
Runway Width: 100 ft / 30 m
Surface Type: Asphalt
Heading: 180° / 360°
Runway Width: 100 ft / 30 m
Surface Type: Asphalt
Heading: 180° / 360°
RWY 17 (180°)
No ILS / Visual Only
RWY 35 (360°)
No ILS / Visual Only
AWOS AWOS 3
110.60 MHz
CNTR MINNEAPOLIS CNTR
132.05 MHz
RDO PRINCETON RDO
110.60 MHz
UNIC CTAF/UNICOM
122.80 MHz
Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: FAA NASR · Cycle: Jan 2026