AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

KR-0497

Gwanmobang Heliport · Yangyang

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
0 ft / —
Transition Altitude
14,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Gwanmobang Heliport (KR-0497), located in Yangyang, South Korea. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 0 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 14,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Gwanmobang Heliport
ICAO / IATA
KR-0497 / —
Municipality
Yangyang
Country
Region
KR-42 — Gangwon Teukbyeoljachi-do (Gangwon Special Self-Governing Province)
GPS Coordinates
Transition Altitude
14,000 ft
Elevation
0 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

RKNYILS
Yangyang International Airport
13 km / 7 nm
RKNN
Gangneung Airport (K-18)
54 km / 29 nm
RKNW
Wonju Airport / Hoengseong Air Base (K-38/K-46)
90 km / 49 nm
RKTI
Jungwon Air Base/Chungju Airport
133 km / 72 nm
RKSM
Seoul Air Base (K-16)
145 km / 78 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026