AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

KR-0614

Yullyang-dong Helipad · Yullyang-dong

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
0 ft / —
Transition Altitude
14,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Yullyang-dong Helipad (KR-0614), located in Yullyang-dong, South Korea. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 0 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 14,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Yullyang-dong Helipad
ICAO / IATA
KR-0614 / —
Municipality
Yullyang-dong
Country
Region
KR-43 — Chungcheongbuk-do (North Chungcheong Province)
GPS Coordinates
Transition Altitude
14,000 ft
Elevation
0 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

RKTUILS
Cheongju International Airport/Cheongju Air Base (K-59/G-513)
5 km / 3 nm
RKTI
Jungwon Air Base/Chungju Airport
52 km / 28 nm
RKSG
Camp Humphreys (A-511) Desiderio Army Airfield
53 km / 29 nm
RKSO
Osan Air Base
63 km / 34 nm
RKTY
Yecheon Airbase
75 km / 41 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026