AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

MHIN

Minas De Oro Airport · Minas de Oro

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
1,000 ft / 305 m
Transition Altitude
18,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Minas De Oro Airport (MHIN), located in Minas de Oro, Honduras. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 1,000 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 18,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Minas De Oro Airport
ICAO / IATA
MHIN / —
Municipality
Minas de Oro
Country
Region
HN-CM — Comayagua Department
GPS Coordinates
Transition Altitude
18,000 ft
Elevation
1,000 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

MHSCILS
Palmerola International Airport / José Enrique Soto Cano Air Base
54 km / 29 nm
MHTGILS
Toncontín International Airport
82 km / 44 nm
MHLM
Ramón Villeda Morales International Airport
96 km / 52 nm
MHTE
Tela Airport
111 km / 60 nm
MHLC
Goloson International Airport
119 km / 64 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026