AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

MX-0029

Puerto Cortés Airstrip · Comondú

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
6 ft / 2 m
Transition Altitude
18,500 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Puerto Cortés Airstrip (MX-0029), located in Comondú, Mexico. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 6 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 18,500 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Puerto Cortés Airstrip
ICAO / IATA
MX-0029 / —
Municipality
Comondú
Country
Region
MX-BCS — Baja California Sur
GPS Coordinates
Transition Altitude
18,500 ft
Elevation
6 ft
Wikipedia

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

MMLPILS
Manuel Márquez de León International Airport
155 km / 84 nm
MMLT
Loreto International Airport
175 km / 95 nm
MMSL
Cabo San Lucas International Airport
256 km / 138 nm
MMSDILS
Los Cabos International Airport
260 km / 140 nm
MMLM
Valle del Fuerte International Airport
307 km / 166 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026