AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

MX-0275

Pesca Azteca Heliport · Mazatlán

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
25 ft / 8 m
Transition Altitude
18,500 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Pesca Azteca Heliport (MX-0275), located in Mazatlán, Mexico. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 25 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 18,500 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Pesca Azteca Heliport
ICAO / IATA
MX-0275 / —
Municipality
Mazatlán
Country
Region
MX-SIN — Sinaloa
GPS Coordinates
Transition Altitude
18,500 ft
Elevation
25 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

MMMZILS
General Rafael Buelna International Airport
14 km / 8 nm
MMCL
Bachigualato Federal International Airport
204 km / 110 nm
MMDO
General Guadalupe Victoria International Airport
215 km / 116 nm
MMEP
Amado Nervo National Airport
255 km / 138 nm
MMPRILS
Puerto Vallarta International Airport
305 km / 165 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026