Reference only — not for real-world navigation.
OIIE
Imam Khomeini International Airport · Tehran
Key Facts
Essential technical summary for MSFS 2020/2024 and X-Plane.
ILS Approach StatusILS FREQUENCIES VERIFIED ✅
Field Elevation
3,305 ft / 1,007 m
Transition Altitude
10,000 ft
Primary Channel
TWR 118.70 MHz (TWR)
Live Conversion
inHg
hPa
Flight Planning
Quick Jump to Next Destination
Tip: Search your next airport to quickly compare ILS data.
Welcome to the technical flight briefing for Imam Khomeini International Airport (OIIE), located in Tehran, Iran. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 2 active runways with a maximum elevation of 3,305 ft. Instrument approaches (IFR) are supported with verified ILS frequencies and identifiers for precision landings.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 10,000 ft verified for this field for altimeter reset procedures.
Full Name
Imam Khomeini International Airport
ICAO / IATA
OIIE / IKA
Municipality
Tehran
Country
Region
IR-23 — Tehran Province
GPS Coordinates
Transition Altitude
10,000 ft
Elevation
3,305 ft
Official Website
Wikipedia
Pilot Toolbox
External charts, live tracking and weather reports.
Runway 11R / 29L
ILS EQUIPPEDUNLIT
Runway Length: 13,940 ft / 4,249 m
Runway Width: 148 ft / 45 m
Surface Type: Asphalt
Heading: 108.8° / 288.8°
Runway Width: 148 ft / 45 m
Surface Type: Asphalt
Heading: 108.8° / 288.8°
RWY 11R (108.8°)
No ILS / Visual Only
RWY 29L (288.8°)
109.70 MHz
IDENT: I-IKB | CRS: 292°
Runway 11L / 29R
ILS EQUIPPEDLIGHTED
Runway Length: 13,772 ft / 4,198 m
Runway Width: 148 ft / 45 m
Surface Type: Asphalt
Heading: 109° / 289°
Runway Width: 148 ft / 45 m
Surface Type: Asphalt
Heading: 109° / 289°
RWY 11L (109°)
No ILS / Visual Only
RWY 29R (289°)
110.10 MHz
IDENT: I-IKA | CRS: 292°
ATIS ATIS
127.20 MHz
GND GND
121.60 MHz
TWR TWR
118.70 MHz
Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026