AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

RK9K

N 325 Helipad · Sinyangseo-gil (Ha-Chuja Island)

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
42 ft / 13 m
Transition Altitude
14,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for N 325 Helipad (RK9K), located in Sinyangseo-gil (Ha-Chuja Island), South Korea. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 42 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 14,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
N 325 Helipad
ICAO / IATA
RK9K / —
Municipality
Sinyangseo-gil (Ha-Chuja Island)
Country
Region
KR-49 — Jeju Teukbyeoljachi-do (Jeju Special Self-Governing Province)
GPS Coordinates
Transition Altitude
14,000 ft
Elevation
42 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

RKPCILS
Jeju International Airport
50 km / 27 nm
RKPD
Jeongseok Airport
70 km / 38 nm
RKJBILS
Muan International Airport
117 km / 63 nm
RKJJILS
Gwangju Airport
139 km / 75 nm
RKJYILS
Yeosu Airport
155 km / 84 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026