Reference only — not for real-world navigation.
RKRN
Icheon (G-510) Airfield · Jinsangmi-ro
Key Facts
Essential technical summary for MSFS 2020/2024 and X-Plane.
ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
255 ft / 78 m
Transition Altitude
14,000 ft
Primary Channel
TWR 123.50 MHz (TWR)
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
10L/28R · 5,314 ft · ConcreteLIGHTED10R/28L · 1,640 ft · ConcreteLIGHTEDFlight Planning
Quick Jump to Next Destination
Tip: Search your next airport to quickly compare ILS data.
Welcome to the technical flight briefing for Icheon (G-510) Airfield (RKRN), located in Jinsangmi-ro, South Korea. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 2 active runways with a maximum elevation of 255 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 14,000 ft verified for this field for altimeter reset procedures.
Full Name
Icheon (G-510) Airfield
ICAO / IATA
RKRN / —
Municipality
Jinsangmi-ro
Country
Region
KR-41 — Gyeonggi-do (Gyeonggi Province)
GPS Coordinates
Transition Altitude
14,000 ft
Elevation
255 ft
Pilot Toolbox
External charts, live tracking and weather reports.
Runway 10L / 28R
LIGHTED
Runway Length: 5,314 ft / 1,620 m
Runway Width: 98 ft / 30 m
Surface Type: Concrete
Heading: 89.6° / 269.6°
Runway Width: 98 ft / 30 m
Surface Type: Concrete
Heading: 89.6° / 269.6°
RWY 10L (89.6°)
No ILS / Visual Only
RWY 28R (269.6°)
No ILS / Visual Only
Runway 10R / 28L
LIGHTED
Runway Length: 1,640 ft / 500 m
Runway Width: 98 ft / 30 m
Surface Type: Concrete
Heading: 90° / 270°
Runway Width: 98 ft / 30 m
Surface Type: Concrete
Heading: 90° / 270°
RWY 10R (90°)
No ILS / Visual Only
RWY 28L (270°)
No ILS / Visual Only
APP OSAN APP
127.90 MHz
DEP OSAN DEP
127.90 MHz
GCA GCA
144.00 MHz
GND GND
51.15 MHz
TWR TWR
123.50 MHz
Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026