Reference only — not for real-world navigation.
RKUL
G 536 Airport · Songdang-ri
Key Facts
Essential technical summary for MSFS 2020/2024 and X-Plane.
ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
104 ft / 32 m
Transition Altitude
14,000 ft
Primary Channel
TWR 38.00 MHz (NON SAN TWR)
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
11L/29R · 3,937 ft · ConcreteLIGHTED11R/29L · 1,476 ft · ConcreteLIGHTEDFlight Planning
Quick Jump to Next Destination
Tip: Search your next airport to quickly compare ILS data.
Welcome to the technical flight briefing for G 536 Airport (RKUL), located in Songdang-ri, South Korea. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 2 active runways with a maximum elevation of 104 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 14,000 ft verified for this field for altimeter reset procedures.
Full Name
G 536 Airport
ICAO / IATA
RKUL / —
Municipality
Songdang-ri
Country
Region
KR-44 — Chungcheongnam-do (South Chungcheong Province)
GPS Coordinates
Transition Altitude
14,000 ft
Elevation
104 ft
Pilot Toolbox
External charts, live tracking and weather reports.
Runway 11L / 29R
LIGHTED
Runway Length: 3,937 ft / 1,200 m
Runway Width: 150 ft / 46 m
Surface Type: Concrete
Heading: 103.6° / 283.6°
Runway Width: 150 ft / 46 m
Surface Type: Concrete
Heading: 103.6° / 283.6°
RWY 11L (103.6°)
No ILS / Visual Only
RWY 29R (283.6°)
No ILS / Visual Only
Runway 11R / 29L
LIGHTED
Runway Length: 1,476 ft / 450 m
Runway Width: 105 ft / 32 m
Surface Type: Concrete
Heading: 110.1° / 290.1°
Runway Width: 105 ft / 32 m
Surface Type: Concrete
Heading: 110.1° / 290.1°
RWY 11R (110.1°)
No ILS / Visual Only
RWY 29L (290.1°)
No ILS / Visual Only
GND GND
47.00 MHz
OPS GYERYONG OPS
30.30 MHz
TWR NON SAN TWR
38.00 MHz
Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026