AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

SD8O

Berço das Gerais Airport · Matias Cardoso

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
1,526 ft / 465 m
Transition Altitude
7,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Berço das Gerais Airport (SD8O), located in Matias Cardoso, Brazil. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 1,526 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 7,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Berço das Gerais Airport
ICAO / IATA
SD8O / —
Municipality
Matias Cardoso
Country
Region
BR-MG — Minas Gerais
GPS Coordinates
Transition Altitude
7,000 ft
Elevation
1,526 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

SBLP
Bom Jesus da Lapa Airport
169 km / 91 nm
SBMK
Mário Ribeiro Airport
216 km / 117 nm
BR-0569
Glauber de Andrade Rocha Airport
290 km / 157 nm
SBBRILS
Presidente Juscelino Kubitschek International Airport
478 km / 258 nm
SBGV
Coronel Altino Machado Airport
490 km / 265 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026