AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

SDC6

Fazenda Bom Destino Airstrip · Aral Moreira

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
1,430 ft / 436 m
Transition Altitude
7,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Fazenda Bom Destino Airstrip (SDC6), located in Aral Moreira, Brazil. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 1,430 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 7,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Fazenda Bom Destino Airstrip
ICAO / IATA
SDC6 / —
Municipality
Aral Moreira
Country
Region
BR-MS — Mato Grosso do Sul
GPS Coordinates
Transition Altitude
7,000 ft
Elevation
1,430 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

SBPP
Ponta Porã Airport
62 km / 33 nm
SGPJ
Aeropuerto Nacional Dr. Augusto Roberto Fuster
64 km / 35 nm
SGGR
Aeropuerto Nacional de Salto del Guaira
153 km / 83 nm
SGCO
Lieutenant Colonel Carmelo Peralta National Airport
222 km / 120 nm
SGIB
Aeropuerto Nacional de Itaipú
280 km / 151 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026