AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

SG-0003

Lim Chu Kang Road (Tengah Highway Strip) · Western Water Catchment

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
0 ft / —
Transition Altitude
11,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Lim Chu Kang Road (Tengah Highway Strip) (SG-0003), located in Western Water Catchment, Singapore. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 0 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 11,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Lim Chu Kang Road (Tengah Highway Strip)
ICAO / IATA
SG-0003 / —
Municipality
Western Water Catchment
Country
Region
SG-03 — North West
GPS Coordinates
Transition Altitude
11,000 ft
Elevation
0 ft
Official Website

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

WSAT
Tengah Air Base
1 km / 1 nm
WSAG
Sembawang Air Base
13 km / 7 nm
WSSLILS
Seletar Airport
19 km / 10 nm
WSAP
Paya Lebar Air Base
24 km / 13 nm
WMKJ
Senai International Airport
28 km / 15 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026