AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

SGRO

Aeródromo de Rosario · Rosario

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
236 ft / 72 m
Transition Altitude
5,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Aeródromo de Rosario (SGRO), located in Rosario, Paraguay. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 236 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 5,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Aeródromo de Rosario
ICAO / IATA
SGRO / —
Municipality
Rosario
Country
Region
PY-2 — San Pedro Department
GPS Coordinates
Transition Altitude
5,000 ft
Elevation
236 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

SGASILS
Aeropuerto Internacional Silvio Pettirossi
99 km / 53 nm
SGCO
Lieutenant Colonel Carmelo Peralta National Airport
114 km / 62 nm
PY-0002
Aeropuerto Nacional de Coronel Oviedo
141 km / 76 nm
SARF
Formosa National Airport
227 km / 123 nm
SGPJ
Aeropuerto Nacional Dr. Augusto Roberto Fuster
238 km / 129 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026