AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

SHIQ

Cuartel Gral. VI División de Ejercito Heliport · Iquique

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
26 ft / 8 m
Transition Altitude
10,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Cuartel Gral. VI División de Ejercito Heliport (SHIQ), located in Iquique, Chile. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 26 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 10,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Cuartel Gral. VI División de Ejercito Heliport
ICAO / IATA
SHIQ / —
Municipality
Iquique
Country
Region
CL-TA — Tarapacá Region
GPS Coordinates
Transition Altitude
10,000 ft
Elevation
26 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

SCDAILS
Diego Aracena Airport
34 km / 18 nm
SCARILS
Chacalluta Airport
210 km / 114 nm
SCBE
Barriles Airport
213 km / 115 nm
SPTN
Coronel FAP Carlos Ciriani Santa Rosa International Airport
242 km / 131 nm
SCCFILS
El Loa Airport
283 km / 153 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026