AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

SIJ7

Fazenda Esperança Airport · São José do Xingu

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
1,024 ft / 312 m
Transition Altitude
7,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Fazenda Esperança Airport (SIJ7), located in São José do Xingu, Brazil. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 1,024 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 7,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Fazenda Esperança Airport
ICAO / IATA
SIJ7 / —
Municipality
São José do Xingu
Country
Region
BR-MT — Mato Grosso
GPS Coordinates
Transition Altitude
7,000 ft
Elevation
1,024 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

SBCC
Campo de Provas Brigadeiro Veloso
318 km / 172 nm
SBAA
Conceição do Araguaia Airport
391 km / 211 nm
SBPN
Porto Nacional Airport
422 km / 228 nm
SBPJ
Brigadeiro Lysias Rodrigues Airport
425 km / 230 nm
SBAT
Piloto Osvaldo Marques Dias Airport
426 km / 230 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026