AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

SJ7O

Fazenda Primavera Airport · Rio Verde de Mato Grosso

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
807 ft / 246 m
Transition Altitude
7,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Fazenda Primavera Airport (SJ7O), located in Rio Verde de Mato Grosso, Brazil. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 807 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 7,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Fazenda Primavera Airport
ICAO / IATA
SJ7O / —
Municipality
Rio Verde de Mato Grosso
Country
Region
BR-MS — Mato Grosso do Sul
GPS Coordinates
Transition Altitude
7,000 ft
Elevation
807 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

SBCGILS
Campo Grande Airport
213 km / 115 nm
SBRD
Maestro Marinho Franco Airport
223 km / 120 nm
SBCR
Corumbá International Airport
291 km / 157 nm
SLPS
Capitán Av. Salvador Ogaya G. airport
306 km / 165 nm
SBCYILS
Marechal Rondon Airport
348 km / 188 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026