AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

SPCI

Campamento De Ilo Aerodrome ·

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
197 ft / 60 m
Transition Altitude
4,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Campamento De Ilo Aerodrome (SPCI), located in the region of, Peru. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 197 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 4,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Campamento De Ilo Aerodrome
ICAO / IATA
SPCI / —
Municipality
Country
Region
PE-MOQ — Moquegua Region
GPS Coordinates
Transition Altitude
4,000 ft
Elevation
197 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

SPLO
General Jorge Fernandez Maldon Airport
9 km / 5 nm
SPTN
Coronel FAP Carlos Ciriani Santa Rosa International Airport
122 km / 66 nm
SCARILS
Chacalluta Airport
133 km / 72 nm
SPQUILS
Rodríguez Ballón International Airport
144 km / 78 nm
SPJLILS
Inca Manco Capac International Airport
270 km / 146 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026