AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

SPRR

Revalora Airport · San Vicente de Cañete

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
591 ft / 180 m
Transition Altitude
4,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Revalora Airport (SPRR), located in San Vicente de Cañete, Peru. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 591 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 4,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Revalora Airport
ICAO / IATA
SPRR / —
Municipality
San Vicente de Cañete
Country
Region
PE-LIM — Lima Region
GPS Coordinates
Transition Altitude
4,000 ft
Elevation
591 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

SPSO
Captain Renán Elías Olivera International Airport
58 km / 31 nm
SPIM
Jorge Chávez International Airport
162 km / 87 nm
SPJJ
Francisco Carle Airport
182 km / 98 nm
SPHOILS
Air Force Colonel Alfredo Mendivil Duarte Airport
224 km / 121 nm
SPZA
Maria Reiche Neuman Airport
230 km / 124 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026