AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

SSUW

Fazenda Palmeiras Airport · Centenário do Sul

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
1,470 ft / 448 m
Transition Altitude
7,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Fazenda Palmeiras Airport (SSUW), located in Centenário do Sul, Brazil. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 1,470 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 7,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Fazenda Palmeiras Airport
ICAO / IATA
SSUW / —
Municipality
Centenário do Sul
Country
Region
BR-PR — Paraná
GPS Coordinates
Transition Altitude
7,000 ft
Elevation
1,470 ft
Wikipedia

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

SBDN
Presidente Prudente Airport
67 km / 36 nm
SBLOILS
Governor José Richa Airport
73 km / 39 nm
SBMG
Regional de Maringá - Sílvio Name Júnior Airport
94 km / 51 nm
SBML
Frank Miloye Milenkowichi–Marília State Airport
175 km / 94 nm
SBTL
Telêmaco Borba Airport
192 km / 104 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026