Reference only — not for real-world navigation.
SULS
Capitan Corbeta CA Curbelo International Airport · Punta del Este
Key Facts
Essential technical summary for MSFS 2020/2024 and X-Plane.
ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
95 ft / 29 m
Transition Altitude
5,000 ft
Primary Channel
TWR 118.30 MHz (TWR)
Live Conversion
inHg
hPa
Flight Planning
Quick Jump to Next Destination
Tip: Search your next airport to quickly compare ILS data.
Welcome to the technical flight briefing for Capitan Corbeta CA Curbelo International Airport (SULS), located in Punta del Este, Uruguay. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 2 active runways with a maximum elevation of 95 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 5,000 ft verified for this field for altimeter reset procedures.
Full Name
Capitan Corbeta CA Curbelo International Airport
ICAO / IATA
SULS / PDP
Municipality
Punta del Este
Country
Region
UY-MA — Maldonado Department
GPS Coordinates
Transition Altitude
5,000 ft
Elevation
95 ft
Official Website
Wikipedia
Pilot Toolbox
External charts, live tracking and weather reports.
Runway 08 / 26
LIGHTED
Runway Length: 6,998 ft / 2,133 m
Runway Width: 148 ft / 45 m
Surface Type: Asphalt
Heading: 72.5° / 252.5°
Runway Width: 148 ft / 45 m
Surface Type: Asphalt
Heading: 72.5° / 252.5°
RWY 08 (72.5°)
No ILS / Visual Only
RWY 26 (252.5°)
No ILS / Visual Only
Runway 01 / 19
LIGHTED
Runway Length: 5,249 ft / 1,600 m
Runway Width: 125 ft / 38 m
Surface Type: Asphalt
Heading: 357.9° / 177.9°
Runway Width: 125 ft / 38 m
Surface Type: Asphalt
Heading: 357.9° / 177.9°
RWY 01 (357.9°)
No ILS / Visual Only
RWY 19 (177.9°)
No ILS / Visual Only
A/G A/G
122.10 MHz
ATIS ATIS
117.60 MHz
RDO RDO
45.66 MHz
TWR TWR
118.30 MHz
Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026