Reference only — not for real-world navigation.
SVMG
Del Caribe Santiago Mariño International Airport · Isla Margarita
Key Facts
Essential technical summary for MSFS 2020/2024 and X-Plane.
ILS Approach StatusILS FREQUENCIES VERIFIED ✅
Field Elevation
74 ft / 23 m
Transition Altitude
11,000 ft
Primary Channel
TWR 118.60 MHz (TWR)
Live Conversion
inHg
hPa
Flight Planning
Quick Jump to Next Destination
Tip: Search your next airport to quickly compare ILS data.
Welcome to the technical flight briefing for Del Caribe Santiago Mariño International Airport (SVMG), located in Isla Margarita, Venezuela. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 2 active runways with a maximum elevation of 74 ft. Instrument approaches (IFR) are supported with verified ILS frequencies and identifiers for precision landings.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 11,000 ft verified for this field for altimeter reset procedures.
Full Name
Del Caribe Santiago Mariño International Airport
ICAO / IATA
SVMG / PMV
Municipality
Isla Margarita
Country
Region
VE-O — Nueva Esparta State
GPS Coordinates
Transition Altitude
11,000 ft
Elevation
74 ft
Wikipedia
Pilot Toolbox
External charts, live tracking and weather reports.
Runway 09 / 27
ILS EQUIPPEDLIGHTED
Runway Length: 10,499 ft / 3,200 m
Runway Width: 150 ft / 46 m
Surface Type: Asphalt
Heading: 78° / 258°
Runway Width: 150 ft / 46 m
Surface Type: Asphalt
Heading: 78° / 258°
RWY 09 (78°)
110.30 MHz
IDENT: I-PMV | CRS: 89°
RWY 27 (258°)
No ILS / Visual Only
Runway 09L / 27R
UNLIT
Runway Length: 9,958 ft / 3,035 m
Runway Width: 100 ft / 30 m
Surface Type: Asphalt
Heading: 78° / 258°
Runway Width: 100 ft / 30 m
Surface Type: Asphalt
Heading: 78° / 258°
RWY 09L (78°)
No ILS / Visual Only
RWY 27R (258°)
No ILS / Visual Only
APP MARGARITA APP
119.90 MHz
ATIS ATIS
114.10 MHz
GND GND
121.90 MHz
TWR TWR
118.60 MHz
Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026