AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

SWAI

Fazenda Alvorada I Airport · São José do Xingu

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
1,699 ft / 518 m
Transition Altitude
7,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Fazenda Alvorada I Airport (SWAI), located in São José do Xingu, Brazil. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 1,699 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 7,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Fazenda Alvorada I Airport
ICAO / IATA
SWAI / —
Municipality
São José do Xingu
Country
Region
BR-MT — Mato Grosso
GPS Coordinates
Transition Altitude
7,000 ft
Elevation
1,699 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

SBCC
Campo de Provas Brigadeiro Veloso
296 km / 160 nm
SBAT
Piloto Osvaldo Marques Dias Airport
389 km / 210 nm
SBAA
Conceição do Araguaia Airport
452 km / 244 nm
SBPN
Porto Nacional Airport
465 km / 251 nm
SBPJ
Brigadeiro Lysias Rodrigues Airport
472 km / 255 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026