Reference only — not for real-world navigation.
UMMS
Minsk National Airport · Minsk
Key Facts
Essential technical summary for MSFS 2020/2024 and X-Plane.
ILS Approach StatusILS FREQUENCIES VERIFIED ✅
Field Elevation
670 ft / 204 m
Transition Altitude
5,000 ft
Primary Channel
TWR 118.30 MHz (TWR)
Live Conversion
inHg
hPa
Flight Planning
Quick Jump to Next Destination
Tip: Search your next airport to quickly compare ILS data.
Welcome to the technical flight briefing for Minsk National Airport (UMMS), located in Minsk, Belarus. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 2 active runways with a maximum elevation of 670 ft. Instrument approaches (IFR) are supported with verified ILS frequencies and identifiers for precision landings.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 5,000 ft verified for this field for altimeter reset procedures.
Full Name
Minsk National Airport
ICAO / IATA
UMMS / MSQ
Municipality
Minsk
Country
Region
BY-MI — Minsk Region
GPS Coordinates
Transition Altitude
5,000 ft
Elevation
670 ft
Official Website
Wikipedia
Pilot Toolbox
External charts, live tracking and weather reports.
Runway 13L / 31R
ILS EQUIPPEDLIGHTED
Runway Length: 12,139 ft / 3,700 m
Runway Width: 197 ft / 60 m
Surface Type: CONC
Heading: 138° / 318°
Runway Width: 197 ft / 60 m
Surface Type: CONC
Heading: 138° / 318°
RWY 13L (138°)
111.70 MHz
IDENT: I-MS | CRS: 129°
RWY 31R (318°)
108.90 MHz
IDENT: I-MN | CRS: 309°
Runway 13R / 31L
LIGHTED
Runway Length: 11,946 ft / 3,641 m
Runway Width: 197 ft / 60 m
Surface Type: Concrete
Heading: 139° / 319°
Runway Width: 197 ft / 60 m
Surface Type: Concrete
Heading: 139° / 319°
RWY 13R (139°)
No ILS / Visual Only
RWY 31L (319°)
No ILS / Visual Only
APP MINSK APP
125.90 MHz
ATIS ATIS
128.85 MHz
GND GND
121.70 MHz
PMSV MINSK VOLMET
126.67 MHz
RDR MINSK RADAR
125.25 MHz
TWR TWR
118.30 MHz
Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026