AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

US-3391

Weston Ranch Ultralight Flightpark · Prineville

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
3,000 ft / 914 m
Transition Altitude
18,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Weston Ranch Ultralight Flightpark (US-3391), located in Prineville, United States. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 3,000 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 18,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Weston Ranch Ultralight Flightpark
ICAO / IATA
US-3391 / —
Municipality
Prineville
Country
Region
US-OR — Oregon
GPS Coordinates
Transition Altitude
18,000 ft
Elevation
3,000 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

KRDMILS
Roberts Field
14 km / 7 nm
KDLSILS
Columbia Gorge Regional Airport
139 km / 75 nm
KSLEILS
Salem-Willamette Valley Airport/McNary Field
163 km / 88 nm
KUAOILS
Aurora State Airport
164 km / 89 nm
KTTD
Portland Troutdale Airport
167 km / 90 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026