AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

VE-0118

Central Tacoa HLS · Catia La Mar

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
6 ft / 2 m
Transition Altitude
11,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Central Tacoa HLS (VE-0118), located in Catia La Mar, Venezuela. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 6 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 11,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Central Tacoa HLS
ICAO / IATA
VE-0118 / —
Municipality
Catia La Mar
Country
Region
VE-X — La Guaira State
GPS Coordinates
Transition Altitude
11,000 ft
Elevation
6 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

SVMIILS
Maiquetía Simón Bolívar International Airport
10 km / 5 nm
SVFM
Generalissimo Francisco de Miranda Air Base
28 km / 15 nm
SVCS
Caracas Óscar Machado Zuloaga International Airport
44 km / 24 nm
SVMP
Metropolitano International Airport
60 km / 32 nm
SVBL
El Libertador Airbase
69 km / 37 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026