Reference only — not for real-world navigation.
WARR
Juanda International Airport · Surabaya
Key Facts
Essential technical summary for MSFS 2020/2024 and X-Plane.
ILS Approach StatusILS FREQUENCIES VERIFIED ✅
Field Elevation
9 ft / 3 m
Transition Altitude
11,000 ft
Primary Channel
TWR 118.10 MHz (Tower - Secondary)
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
10/28 · 9,843 ft · AsphaltLIGHTEDFlight Planning
Quick Jump to Next Destination
Tip: Search your next airport to quickly compare ILS data.
Welcome to the technical flight briefing for Juanda International Airport (WARR), located in Surabaya, Indonesia. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 1 active runway with a maximum elevation of 9 ft. Instrument approaches (IFR) are supported with verified ILS frequencies and identifiers for precision landings.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 11,000 ft verified for this field for altimeter reset procedures.
Full Name
Juanda International Airport
ICAO / IATA
WARR / SUB
Municipality
Surabaya
Country
Region
ID-JI — Jawa Timur (East Java)
GPS Coordinates
Transition Altitude
11,000 ft
Elevation
9 ft
Official Website
Wikipedia
Pilot Toolbox
External charts, live tracking and weather reports.
Runway 10 / 28
ILS EQUIPPEDLIGHTED
Runway Length: 9,843 ft / 3,000 m
Runway Width: 148 ft / 45 m
Surface Type: Asphalt
Heading: 99.3° / 279.3°
Runway Width: 148 ft / 45 m
Surface Type: Asphalt
Heading: 99.3° / 279.3°
RWY 10 (99.3°)
110.30 MHz
IDENT: I-SBY | CRS: 98°
RWY 28 (279.3°)
No ILS / Visual Only
ATIS ATIS
128.20 MHz
DIR Surabaya Director Secondary
123.20 MHz
DIR Surabaya Director (Primary)
125.10 MHz
SMC Ground Control
119.15 MHz
TCA Surabaya Control - Primary
123.55 MHz
TCA Surabaya Control - Secondary
124.00 MHz
TWR Tower - Secondary
118.10 MHz
TWR Tower - Primary
118.30 MHz
Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026