AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

XP-0002

Zhongjian Dao (Triton Island) Air Base · Triton Island

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
0 ft / —
Transition Altitude
5,000 ft
Primary Channel
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Zhongjian Dao (Triton Island) Air Base (XP-0002), located in Triton Island, Paracel Islands (disputed). As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 0 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 5,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Zhongjian Dao (Triton Island) Air Base
ICAO / IATA
XP-0002 / —
Municipality
Triton Island
Country
Region
XP-U-A — (unassigned)
GPS Coordinates
Transition Altitude
5,000 ft
Elevation
0 ft

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

No frequency data available.

Nearby Airports

Alternative airports in the vicinity (km & nm).

VVPC
Phu Cat Airport
309 km / 167 nm
VVDNILS
Da Nang International Airport
323 km / 174 nm
CN-0072
Lingshui Air Base
328 km / 177 nm
ZJSY
Sanya Phoenix International Airport
339 km / 183 nm
VVTH
Dong Tac Airport
365 km / 197 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026