AirportLookupSim Database
Back to Search

Reference only — not for real-world navigation.

BIMS

Tungubakkar Airport · Tungubakkar

Key Facts

Essential technical summary for MSFS 2020/2024 and X-Plane.

ILS Approach StatusILS DATA NOT IN DATABASE
Field Elevation
5 ft / 2 m
Transition Altitude
7,000 ft
Primary Channel
afis 118.20 MHz (Tungubakki)
Live Conversion
inHg
hPa
Runway Summary (Quick-Links)
Flight Planning
Quick Jump to Next Destination

Tip: Search your next airport to quickly compare ILS data.

Welcome to the technical flight briefing for Tungubakkar Airport (BIMS), located in Tungubakkar, Iceland. As a vital hub for Microsoft Flight Simulator 2024, MSFS 2020, and X-Plane pilots, this facility features 0 active runways with a maximum elevation of 5 ft. Please note that this field primarily supports VFR and visual approach procedures.Reference the data below for primary communication channels and detailed runway characteristics. Pilots should observe a Transition Altitude of 7,000 ft verified for this field for altimeter reset procedures.

Airport Details

Full geographical and organizational metadata.

Full Name
Tungubakkar Airport
ICAO / IATA
BIMS / —
Municipality
Tungubakkar
Country
Region
IS-1 — Capital Region
GPS Coordinates
Transition Altitude
7,000 ft
Elevation
5 ft
Official Website

Pilot Toolbox

External charts, live tracking and weather reports.

🗺️ SkyVector Charts📡 FlightAware Live🌡️ Live METAR🌦️ TAF Forecast🌍 Satellite View

Runways & ILS Approach Data

Detailed dimensions and instrument landing frequencies.

Communication Frequencies

Air traffic control and advisory channels.

TWR: BIRK Reykjavik Tower
118.00 MHz
afis Tungubakki
118.20 MHz

Nearby Airports

Alternative airports in the vicinity (km & nm).

BIRKILS
Reykjavík Domestic Airport
13 km / 7 nm
BIKFILS
Keflavik International Airport
49 km / 26 nm
BIVM
Vestmannaeyjar Airport
110 km / 59 nm
BIIS
Ísafjörður Airport
219 km / 118 nm
BIAR
Akureyri International Airport
237 km / 128 nm

Base Airport Data: OurAirports (Public Domain)
Instrument Approach Data: AIP 2026 Researched · Cycle: Jan 2026